Gas

Key projects

timelapse-MDLSG-Fives-Nordon-FIVES

TEREGA (2017-2018) - MDLSG project

Lussagnet-Sauveterre de Guyenne DN600 Modernization project (France) :

  • 21 gas connections

  • 18 months of work

  • 13 operating sites

  • Deadlines met

  • 0 lost time or non-lost time accidents.

 

 

STORENGY (2012-2013) - Germigny storage site 

 

  • Removed abandoned channels.

 

 

TIGF (2009-2013) – gas systems in southwest France

 

  • Built switchrooms and interconnections for the Girland Project
  • Worked on entire transportation network for piping from DN300 to DN900
  • Developed an emergency stop system and brought into compliance isolated wells at gas storage centers at Izaute and Lussagnet sites. 

 

⇒ For recruitment-related matters (application, etc.), please do not use this form. Make your requests on this page.

In order to address your request, we need to collect the information listed in the form below


*

Despatch of these emails is managed by a FIVES partner located in the United States, an active member of Privacy Shield. The partner guarantees processing compliant with European requirements for personal data protection. Unsubscribe with a single click on a link in the message received.


* required fields

Your message has been sent and will be treated as soon as possible. Thank you for contacting Fives.

Sorry, we encountered a problem, your message was not sent