GRP

Key projects

Studies, prefabrication and assembly of piping systems made of composite materials: IPS certified (Level 3), non-certified, seismic calculated; and [currents not certified or measured for seismic activity].

Designed for fire systems in nuclear power plants and saltwater systems on ships.

STX Europe (2010-12) G33, U32 and X32 ships

Procurement, prefabrication and assembly of water lines (swimming pool, cooling, ballasting).

2500-4000 m of piping per ship, DN 40 and 600 mm with a 1.3 accessory rate (ml), 10-16 bar.

Alstom (2011) Flamanville EPR (Manche, France)

Procurement, prefabrication and assembly of water lines.

Piping of up to DN 800 mm.

Total (2009) Donges Refinery (Loire-Atlantique, France)

Procurement, prefabrication and assembly of a storage tank water collection system.

120 m of piping, PN 16, DN 150 mm.

⇒ For recruitment-related matters (application, etc.), please do not use this form. Make your requests on this page.

In order to address your request, we need to collect the information listed in the form below


*

Despatch of these emails is managed by a FIVES partner located in the United States, an active member of Privacy Shield. The partner guarantees processing compliant with European requirements for personal data protection. Unsubscribe with a single click on a link in the message received.


* required fields

Your message has been sent and will be treated as soon as possible. Thank you for contacting Fives.

Sorry, we encountered a problem, your message was not sent